Verify before disturbing systems
Confirm drainage, utilities, structure, equipment and approvals before excavation or alteration.

Installation planning
High-level practice guidance for organizing safe, verifiable and maintainable installation work without replacing trade instructions or project design.
Who this is for
Independent education and standards-informed practice guidance.
Law, code, municipal rules, permits, manufacturer instructions and qualified professional decisions remain controlling.
Owners, designers, contractors, inspectors and authorities retain assigned duties.
Core principles
Confirm drainage, utilities, structure, equipment and approvals before excavation or alteration.
Plumbing, electrical, excavation and engineering work must remain within lawful competence.
Approved equipment must be installed and commissioned according to applicable instructions.
Do not trade convenience for inaccessible valves, pumps, sensors or records.
Practice detail
Define work boundaries, existing conditions, flooding pathway, design basis, permits, locates, occupants, shutdowns and contingencies. Confirm whether the work affects structure, electrical systems, sanitary or storm services, accessibility or public property.

Practice detail
Use hold points before cutting, connection, concealment, backfill and energization. Verify compatible materials, support, access, cleanouts, discharge, electrical approval, labelling and protection. Record field changes before they disappear.

Practice detail
Demonstrate safe operation, alarms and backup where applicable, access and labels. Handover should include photos, product information, permits, inspections, limitations, maintenance instructions and emergency steps.

Working sequence
Confirm risk, scope and approvals.
Obtain locates and plan access.
Verify materials and competent roles.
Inspect before concealment.
Commission and complete handover.
Avoidable failures

Related pathways
Official and institutional references
RSM summarizes concepts for education. Use current official documents, local authorities and qualified professionals for project decisions.
Frequently asked questions
No. It provides high-level planning and quality guidance.
Ontario One Call requires locates before breaking ground where underground infrastructure may be affected.
A planned stage where work stops for verification before concealment, backfill or energization.
That depends on the work, permit, contract, regulator and authority having jurisdiction.
Standards-informed practice
Connect knowledge with competent roles, approvals, records, inspection, maintenance and transparent communication.
Published: July 19, 2026 Last reviewed: July 19, 2026
RSM provides independent educational and standards-informed guidance. Confirm current legal, code, municipal, professional, product and project requirements with the appropriate authority and qualified people.